Terraforming
Field Manual
A world does not arrive ready to build on. Terraformers cut the hills, fill the hollows, and leave flat, buildable ground behind them — and the same machines can dig trenches and raise walls that change how a battle on the surface plays out.
Why Terraform
On planet surfaces, a building can only go down on level ground. If the ground under a structure’s footprint rises more than 10 cm from its lowest point to its highest, placement is refused with “ground not level enough to build on”. Small buildings can often find a flat spot on their own; larger ones almost never can.
That is what Terraformers are for. A finished pad is perfectly level, so any structure placed inside one passes the check. Flatten first, then build.
The Terraformers
Four tracked ground vehicles do the digging. They are unarmed, they work faster the higher the tier, and their dig rates simply add together when they share a site.
| Terraformer | Dig Rate (m²/h) | Tier | Research | Built At | Rides a Skyhook |
|---|---|---|---|---|---|
| TF-0A GRIT | 200 | 1 | None — ready from day one | Anvil, Warforge, Bedrock | No |
| TF-0B VORAX | 400 | 3 | ~4.2 h | Anvil, Warforge, Bedrock | No |
| TF-1A Tekton | 800 | 5 | ~56 h | Warforge, Bedrock | Yes — 2 per Skyhook |
| TF-2A ROK-R | 2,000 | 6 | ~112 h | Bedrock only | No — too large |
The GRIT needs no research, so any new colony can field one from an Anvil. The VORAX doubles its work for a short research project. The Tekton is the standard Voran earthmover, and the ROK-R cuts in an hour what a Tekton cuts in two and a half — but only the PF-3A Bedrock has bays big enough to build it.
The Skyhook
The DX-1A Skyhook is a drone carrier built around two Terraformer bays. It carries nothing else and mounts no guns.
A Skyhook carries up to two TF-1A Tektons — and only Tektons. The GRIT and VORAX are too small for its bays, and the ROK-R is too large. Load Tektons the way you dock any unit, fly the Skyhook to the world you want to shape, and undock them: each Tekton is set down on clear, drivable ground near the carrier, ready to be sent to a site.
Dig Shapes
Every job is one of four shapes. Pads and pits are rectangles; trenches and berms are lines with a width.
| Shape | What It Does | Use It For |
|---|---|---|
| Pad · Flatten pad | Sets a rectangle to one flat height — cut down or built up to it. | Building sites. The shape you will use most. |
| Pit · Dig a hole | Cuts a rectangle down to a set depth. | Sunken positions, foundations below a ridge line. |
| Trench · Dig a channel | Cuts a line of chosen width down to a set depth. | Cover for ground forces, channels between sites. |
| Berm · Build a wall | Raises a line of chosen width up to a set height. | Walls that block ground line of sight and fire. |
Each shape can have Sloped or Straight sides. Sloped sides run at 2:1 (about 27°) — gentle enough for ground vehicles to drive in and out of a pit or trench. Straight sides keep the footprint tight.
Ordering a Dig
Select one or more Terraformers on a planet surface and press Dig on the action bar. A four-step wizard walks you through the order.
| Step | Action | Details |
|---|---|---|
| 1 | Pick a shape | Pad, pit, trench, or berm. |
| 2 | Mark the area | Press and drag (or click two corners); a line shape is drawn end to end. Drag the handles to resize or move it. The area snaps to the 4 m terrain grid. |
| 3 | Set depth or height | Drag the handle or scroll in 1 m steps, or use the Shallow (4 m), Medium (8 m), and Deep (12 m) presets. Choose Sloped or Straight sides. |
| 4 | Review and pay | Check the size, earth moved, time with your selected crew, and cost — then Pay. Credits are taken up front. |
For a pad, the height starts at the average ground level of the area you marked. Move it down to cut the pad into a hillside, or up to build it out over a hollow.
Cost & Time
Both cost and time depend only on the footprint area. Depth and height are free — a 12 m pit costs the same as a 4 m one.
Credits
Terraforming costs credits only — no resources, fuel, or energy. For a trench or berm with sloped sides, the area includes the sloped edges, so deeper channels and taller walls with sloped sides do cost more. Straight sides add nothing.
Time
Worked example: a 48 × 36 m pad is 1,728 m² and costs 432,000 credits.
| Crew | Combined Rate (m²/h) | Time for a 48 × 36 m Pad |
|---|---|---|
| 1 × GRIT | 200 | 8 h 38 min |
| 1 × VORAX | 400 | 4 h 19 min |
| 1 × Tekton | 800 | 2 h 10 min |
| 2 × Tekton (one Skyhook load) | 1,600 | 1 h 5 min |
| 1 × ROK-R | 2,000 | 52 min |
| 4 × GRIT | 800 | 2 h 10 min |
Crews & Sites
A site only progresses while Terraformers are actually working it. Knowing what counts as working is the difference between a pad in an hour and a site that closes on you.
When you place an order, each selected Terraformer drives itself to a spot beside the site. It only digs while it is parked within 12.5 m of the site, still yours, and not moving. A site takes up to 64 Terraformers; to add more, select them, click the site on the ground, and choose Send to this site.
The ground changes in four stages — at 25%, 50%, 75%, and 100% — and the site card shows the stage, progress, time left, and crew size.
Queues, pauses, and cancelling
Limits & Rules
The world enforces these limits on every order.
| Rule | Limit |
|---|---|
| Where | Planet surfaces only — gas planets cannot be terraformed |
| Largest site | 40,000 m² (e.g. 200 × 200 m) |
| Deepest pit or trench | 50 m |
| Tallest berm | 30 m |
| Distance from any building | 4 m (anyone’s building, not just yours) |
| Distance from the map edge | 16 m |
| Water | You cannot dig below the water line |
| Smallest site | Rectangles 4 m a side · trenches 8 m wide · berms 12 m wide |
| Crew per site | Up to 64 Terraformers |
| Work reach | A Terraformer must be parked within 12.5 m of the site |
| Sloped sides | 2:1 (about 27°) — shallow enough to drive in and out |
The Ground in Combat
Terrain is not just scenery. Ground units cannot see or shoot through hills — and that includes the ones you build.
Ridges, berms, and pit rims block line of sight and line of fire for ground units. Air units see over terrain lower than they fly. A berm across an approach, or a trench to hold vehicles below the skyline, is a real defensive tool.
Warning Signs
The messages you will run into while terraforming, what causes them, and how to clear them.
Key Tips
Earthworks doctrine — the habits that keep crews digging and credits working.